Al Futtaim Colas LLC
Jan 8, 2025

- Trial pits and trenches to ascertain/ verify/ locate existing services ; maximum length 3m, excavation by hand
- Depth backfilled with excavated material
- Depth in material other than rock
- Precast concrete interlocking paving tiles; thickness 80mm on and including 40mm thick sand bed
- Excavation for cutting; artificial hard material; existing road pavement; max. depth not exceeding 0.25m comprising of AC wearing course and /or AC base course
- Disposal of excavated material other than top soil, rock or artificial hard material as per client instruction
- Relocation of Speed hump sign Board
- Shifting of safety materials including labour &
- plant between store and site – Material by main contractor (1 hiab crane, 6 labors, and 1 foreman)
- Tactile pavement for pedestrian Crossing ends
- Precast concrete block paving tiles; thickness 60mm on and including 40mm thick sand bed
- Preparation of excavated surfaces to receive perm