  • Trial pits and trenches to ascertain/ verify/ locate existing services ; maximum length 3m, excavation by hand

  • Depth backfilled with excavated material

  • Depth in material other than rock

  • Precast concrete interlocking paving tiles; thickness 80mm on and including 40mm thick sand bed

  • Excavation for cutting; artificial hard material; existing road pavement; max. depth not exceeding 0.25m comprising of AC wearing course and /or AC base course

  • Disposal of excavated material other than top soil, rock or artificial hard material as per client instruction

  • Relocation of Speed hump sign Board

  • Shifting of safety materials including labour &

  • plant between store and site – Material by main contractor (1 hiab crane, 6 labors, and 1 foreman)

  • Tactile pavement for pedestrian Crossing ends

  • Precast concrete block paving tiles; thickness 60mm on and including 40mm thick sand bed

  • Preparation of excavated surfaces to receive perm

Address

Jabal Al Suraj Transportation LLC

Office-207 Iliyaa Tower 2

AL Qusais Industrial Area 3, Dubai -UAE

P.O.BOX:79486

Bin Dasmal Building

Office no 55

Al Quoz Industrial Area 1 Dubai

Contact Us

Mob:
+971 52 849 9918
+971 52 888 5458
+971 55 646 6882

E-mail:
Info@jabalalsuraj.ae
Jabalalsurraj@gmail.com

Address

Jabal Al Suraj Transportation LLC

Office-207 Iliyaa Tower 2

AL Qusais Industrial Area 3, Dubai -UAE

P.O.BOX:79486

Bin Dasmal Building

Office no 55

Al Quoz Industrial Area 1 Dubai

Contact Us

Mob:
+971 52 849 9918
+971 52 888 5458
+971 55 646 6882

E-mail:
Info@jabalalsuraj.ae
Jabalalsurraj@gmail.com